Copied the text..
9.46 25.49 10.94 10.84 10.84 10.84 10.84 12.59 15.02 14.02 14.05 23.91 17.24 13.02 6.28 15.46 10.39 15.46 8.40 48.99 48.99 OFFICE 001 002 OFFICE 003 OFFICE H.O.S. OFFICE 004 023 OFFICE OFFICE 006 007 OFFICE MEETING 022 STORE 008 010 OFFICE OFFICE 011 OFFICE 012 013 021 020 OFFICE OFFICE 019 018 OFFICE OFFICE 017 OFFICE 016 014 CLASSROOM SHARED OFFICES FEMALE CLEANER Building B Level 0 OFFICE OFFICE RECEPTION 015 015b 015a DISABLE MEETING RM OFFICE GENERAL OFFICE WORK STATIONS MAIL RM COPIER 0 1 2 3 4 5 N 10.16 25.21 10.15 17.48 17.48 17.48 17.48 14.62 14.62 14.62 10.14 10.55 12.83 12.08 12.13 12.62 7.38 10.68 22.39 15.44 15.44 11.32 12.63 12.74 OFFICE 121 112 OFFICE OFFICE 110 111 OFFICE 120 OFFICE 109 OFFICE OFFICE 119 CLEANER MALE 117 OFFICE OFFICE 115 114 OFFICE OFFICE 113 122 OFFICE OFFICE 123 101 OFFICE OFFICE 102 103 OFFICE OFFICE 104 105 OFFICE 125 124 107 108 STORAGE OFFICE 3 OFFICE 4 106 35.49 18.23 118 STAFFROOM OFFICE 118a 0 1 2 3 4 5 MEETING SESSIONAL STAFF OFFICE OFFICE ISSUE DATE: 29/03/2018 VALIDATION DATE: 29/03/2023 Building B Level 1 ISSUE DATE: 29/03/2018 VALIDATION DATE: 29/03/2023 N 116 Area 8.7 86.92 4.97 73.47 74.74 74.74 111.86 36.31 6.05 902 901 LECTURE THEATRE 905 POST GRADUATESTUDENTS OFFICE CLASSROOM 906 LECTURE THEATRE PLANT ROOM MALE DIS. WC 0 1 2 3 4 5 903a 903c OFFICE 904 OFFICE 903 Building BLevel 9 N OFFICE WC OFFICE 905a STAIR DOWN 37.70 51.07 49.98 21.89 19.18 9.76 7.74 294.88 114.05 CUPBOARD SHAFT DUCT SERVERY RAMP UP KIOSK 005 MALE W.C. FEMALE W.C. ENTRY LOBBY TUTORIAL 002 TUTORIAL 003 TUTORIAL 004 LECTURE THEATRE 001 AUDIO RM 001A LOBBY VERANDAH 0 1 2 3 4 5 Building C Level 0 Lecture Theatre 001: 357 seats N STAIRS UP 37.63 50.68 50.63 3.96 14.84 10.13 8.60 52.51 RAMP UP SERVERY URINAL TUTORIAL 901 TUTORIAL 902 TUTORIAL 903 LOBBY HIGH VOLTAGE SUBSTATION PLANT KIOSK 904 LECTURE THEATRE 001 CLEANER DISABLED W.C. MALE W.C. SWITCH ROOM SERVICES DUCT Building C Level 9 N 204.73 23.63 82.41 92.10 69.72 LECTURE THEATRE 211 205 CLASSROOM 202b 201 204 216 206 214 212 215 FEM W.C. MALE W.C. AUDIO VISUAL 211A ARCHIVE UP 203 UP P'COPY Room Allocation Details 207 Building E Level 2 0 1 2 3 4 5 202a OFFICE CLASSROOM CLASSROOM CLASSROOM CLASSROOM OFFICE OFFICE OFFICE CLNR N CLNR 222 CORRIDOR OFFICE 221 TRANSFRMR SWITCHRM OFFICE 220 OFFICE 219 OFFICE 218 OFFICE 217 OFFICE 216 OFFICE 215 OFFICE 214 OFFICE 213 OFFICE 212 OFFICE 211 OFFICE 210 OFFICE 209 OFFICE 208 KCH'N 205 OFFICE 204 OFFICE 203 OFFICE 202 OFFICE 201 OFFICE 230 OFFICE 229 OFFICE 228 OFFICE 227 OFFICE 226 OFFICE 225 FILES 223 COMPUTER LAB 224 TEA 232 OFFICE 233 STAIR up TEA 231 Building F Level 2 TRAINING ROOM VIOSH RESOURCE CENTRE 200 207 234 235 N CORRIDOR 11.36 15.33 13.06 10.39 18.65 14.53 14.53 14.53 14.53 14.53 14.53 14.53 14.53 37.27 9.92 13.65 13.65 13.65 13.65 13.06 13.06 6.31 17.40 12.63 12.63 12.63 12.63 12.63 27.29 13.06 13.08 13.06 8.06 88.52 111.6 118.9 448.18 61.89 216.92 42.88 20.82 19.65 15.48 571.77 58.74 THEATRETTE 1 315 LOUNGE 313 THEATRETTE 2 312 TUTORIAL 1 311 TUTORIAL 2 INDIVIDUAL LEARNING ZONE 1 314 STAIR 1.12 DIS. WC 317 LECTURE THEATRE 301 FEM. WC 309 M.WC 307 SUPPORT STAFF 306 COMPUTER LAB 1 302 COMPUTER LAB 2 303 COMPUTER LAB 3 304 INDIVIDUAL LEARNING ZONE 2 305 LIFT STAIR VOID 321 SMOKE TUNNEL 322 323 327 328 324 325 326 327a 327b 308 316 0 1 2 3 4 5 15.48 N Building F Level 3 ISSUE DATE: 17/10/2018 VALIDATION DATE: 17/10/2023 VACANT VACANT VACANT VACANT VACANT 310 VACANT VACNT VACNT VACNT VACNT 57.77 52.88 11.88 9.19 14.22 14.22 14.22 11.80 59.93 14.22 19.29 12.00 6.80 113.55 12.57 12.57 12.97 13.41 GEOLOGY PRAC. ROOM 201 STAFF 205 204 STAFF STAFF 203 202 A.A.S. LAB. 217 STAFF STAFF 216 215 STAFF STAFF 214 213 STAFF STAFF 212 211a LAB 210 STORE CLASSROOM 209 208 CLASSROOM 211 LABORATORY S.E.M PREP. 206 STORE 207 0 1 2 3 4 5 Building G Level 2 N 57.60 65.99 34.31 99.35 Concrete Retaining Wall Concrete Retaining Wall GLASS HOUSE SHADE HOUSE HORTICULTURE SPACE EXTERNAL PLANT New Webforge Fencing Glass House 0 1 2 3 4 5 N 9.56 9.47 19.51 14.65 11.81 22.55 63.37 72.18 21.14 60.78 4.14 126 125 127 STR 128 129 130 131 132 FEM. W.C. SESSIONAL STAFF CLASSROOM 1 LANGUAGE LAB MALE W.C. LOBBY STAIRS ADMIN. 34.84 124 TUTORIAL 128a 128b 128c 128d Building H Annex Level 1 STAFF STAFF STAFF STAFF STAFF STAFF STAFF N ENTRY 16.87 12.49 12.24 12.18 16.41 13.91 14.08 13.80 17.82 10.48 11.86 12.10 21.26 42.21 9.24 20.03 9.42 12.17 FEM. W.C. SENIOR STAFF 237 238 239 240 236 UTILITY DUCT ELEC COMMS 241 MALE W.C. 242 LOBBY SENIOR STAFF STAFF 235 DUCT 234 STAIRS 243 STAFF 244 STAFF 245 246 T BUILDING 247 249 248 235a 9.47 Building H Annex Level 2 STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF RESEARCH OFFICE ENCLOSED LINK STAFF 24.88 6.44 13.16 34.58 16.40 17.52 16.05 19.44 10.79 10.93 12.68 11.96 11.96 12.03 12.04 11.96 11.96 13.22 11.24 45.88 49.66 123.58 186.19 90.82 92.66 22.19 14.84 118A LECTURE THEATRE 102 118 STORE 3 102A LECTURE THEATRE 101 LABORATORY 103 LABORATORY 2 104 105 PLANT STAFF 106 107 108 109 110 111 112 113 114 115 CONFERENCE ROOM 120 121 STORE CLASSROOM 122 CLASSROOM 123 116 117 FEM. W.C. ROOM 17.64 15.87 119 119a Building H Level 1 MAIL STAFF STAFF STAFF STAFF ROOM N STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF RAMP DOWN THROUGH TO 'H' ANNEX RAMP UP THROUGH TO 'S' ANNEX 21.81 20.82 15.79 16.05 3.68 10.79 13.51 13.06 11.83 12.00 11.88 12.00 11.88 12.00 11.79 11.94 11.97 10.56 12.91 7.24 7.04 28.49 16.00 56.27 24.28 6.95 11.92 3.42 11.72 42.87 10.26 229 MEETING ROOM 230 MALE W.C. PLANT ROOM 211 212 213 214 215 216 217 218 219 220 221 222 223 224 STAFF 225 231 PSYCHOLOGY LABORATORY TEST LIBRARY 231A 232A COGNITION LAB 233 RESEARCH OFFICE PLANT ROOM SESSIONAL STAFF OFFICE 201 OFFICE 202 209 STORE STORE 208 207 STAFF 206 STAFF 205 STAFF 226 STAFF ROOM 228 OFFICE 201a 8.77 33.18 8.79 8.58 8.86 OBSERV'N RM 1 204A OBSERV'N RM 2 203 MULTIPURPOSE ROOM COUNSEL'G 203A PHYCH TESTING 203B Building H Level 2 OFFICE 233a 7.99 STAFF 204 STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF STAFF VIEW N TO BUILDING H ANNEX THROUGH TO 'S' ANNEX 14.25 10.72 3.85 4.51 9.37 16.39 47.45 UP DWN FEM. LIFT DIS. W.C. CLNR MALE W.C. PLANT ROOM OFFICE TRAINING ROOM 1 LIBRARY SKILLS 002 003 001 LEARNING COMMON AREA LOANS DESK 0 1 2 3 4 5 Building L Level 0 004 LIBRARY STAFF OFFICES WORK ROOM OFFICE ENTRY MEETING ROOM OFFICE LIBRARY SKILLS TRAINING ROOM 2 005 006 008 009 010 011 007 016 019 018 017 020 014 015 N W.C. UP DWN UP DWN 16.81 10.72 5.86 LIFT PLANT ROOM MALE W.C. CLNR 201 Main Collection Main Collection 0 1 2 3 4 5 Building L Level 2 ARCHIVE STORE CURATOR'S OFFICE SILENT STUDY AREA BLAINY RESEARCH CENTRE LOBBY Study Area 202 203 204 205 210 206 207 208 209 N DWN DWN DWN STAIRS 60.94 32.62 154.53 61.74 UP UP UP LOADING DOCK LIFT LIBRARY STACK EXISTING PLANT ROOM STORE MEDIA STUDIO Catalogue Terminals and Copy Centre SERVER ROOM 904 902 901 916 PLANT LIFT LOBBY DIS. W.C. CLNR MALE W.C. FEM. W.C. MEETING ROOM 3 MEETING ROOM 2 I.C.T SERVICES CALL CENTRE Collections Collections Study Area 905 907 908 908a 911 912 913 914 WORK ROOM RCRDG 901a 901a N 0 1 2 3 4 5 Building L Level 9 ROOM BOOTH 906 LIBRARY 902 21.30 95.75 70.55 70.55 23.74 9.84 12.30 13.53 14.70 13.12 11.55 13.12 10.15 207.33 61.94 7.02 24.87 15.43 6.98 174.57 396.51 251.51 4.64 5.01 STUDIO THEATRE 034 035 036 FURNITURE STORE 038 BOARD ROOM 039 COURTYARD 033 STORE STUDIO 3 032 040 STUDIO 2 031 030 STUDIO 1 041 SYNDICATE 5 042 043 STAFF OFFICE BOX STAGE PIT ORCHESTRA AUDITORIUM FOYER CLNR FOYER 037 TECH. STORE KTCHN CLOAK DIS. 5.52 KIOSK 0 1 2 3 4 5 Building M Level 0 N FOUNDERS THEATRE W.C. MALE W.C. URINALS FEM. W.C. SYNDCTE 1 SYNDICATE 2 SYNDICATE 3 SYNDICATE 4 125.98 0 1 2 3 4 5 Milling Shed Level 2 N LEGEND Carbon Dioxide CO2 Extinguisher Dry Chemical Powder Extinguisher Exit First Aid Kit Fire Hose Reel Break Glass Alarm Water Extinguisher (General use except Electricity) weightlifting room rehabilitation laboratory foyer disabled shw./wc plant consult 1 consult 3 hydrotherapy pool up down 701 702 703 705 Emergency Floor Plan Printed : 8/08/2018 EVACUATE THIS WAY EVACUATE THIS WAY You are here. Mt Helen Campus PHYSICAL EDUCATION (P) 0 1 2 3 4 5 Level 7 No 8- To Grassed area behind B Building reception store consult 2 704 706a 706 You are here. 719.04 3.12 3.12 3.12 3.12 49.98 12.10 59.90 16.00 18.13 18.90 18.90 18.13 14.05 12.00 6.27 MOTOR BEHAVIOR LABORATORY TECHNICAL SUPPORT AREA BIOMCHNCS EQUIPMNT STORE BIOMECHANICS LABORATORY MALE CHANGE FEMALE CHANGE FEMALE W.C. PLANT ANTE-ROOM CLIMATE CHAMBER M WC MAIN GYM 601 602 603 603 a 602a 604 605 MALE W.C. 69.02 EXAM STORE 607 HUMAN MOVEMENT STORE 608 DRYING 610 OUTDOOR STORE CLASSROOM 612 COVERED AREA 613 OFFICE 611 8.45 24.98 51.64 67.23 41.83 609 Building Q1 Level 6 N F WC CLNR DDA WC AL COURTS RETRACTABLE SEATING FOYER Q613 STORE 1 STORE 2 N Building Q2 Level 6 9.66 3.89 6.11 13.85 13.62 69.04 2.58 34.99 15.07 18.41 STORE UP RAMP DOWN TIMKEN LECTURE THEATRE 245 M. W.C. F. W.C. PORCH 243 OFFICE 241 AMENITIES 242 Store Cool Store Cool H BUILDING UP 240 244 S BUILDING 24.97 LAB 239 S Annex 0 1 2 3 4 5 Level 2 STAFF ROOM 246 NURSING LAB PHYSIOLOGY CLASSROOM 240 239 CLASSROOM DB 4.60 70.18 10.46 13.84 13.48 16.09 17.90 18.76 14.64 69.79 13.47 PIVOT LAB DWN H BUILDING 310 OFFICE CLASSROOM 303 CLASSROOM 302 OFFICE 308 OFFICE 306 307 OFFICE 305 OFFICE OFFICE 304 DOWN 301 OFFICE LINK TO F BUILDING PLANT ROOM CLNR 0 1 2 3 4 5 CLASSROOM 300 PIVOT LAB S Annex Level 3 N DWN 25.74 S001 CENTRAL STUDENT AREA PLANT PLANT Level 0 0 1 2 3 4 5 Building S N GROUP ROOM S001A GROUP RM S001C GROUP RM S001D GROUP RM S001F GROUP RM S001E GROUP RM S001G GROUP RM S001B GROUP RM S001H SWITCH R006 UNISEX TOILETS ACC WC STORE S002 GROUP RM S001I 14.5m 9.1m 11.9m 10m 10.7m 10.9m 11.3m 10.3m 9.8m 4.2m 23.6m 25.1m 28.4m 301.9m 76.56 10.16 51.02 28.39 36.35 7.45 10.56 22.40 77.02 15.57 8.22 15.32 14.90 14.12 19.20 11.34 30.29 10.43 10.43 10.90 12.60 14.85 3.73 72.18 72.81 9.53 20.36 120 121 122 123 124 106 107 108 110 111 113 112 116 115a 115 119 118 M. W.C. F. W.C. STAFF ROOM OFFICE PREPARATION ROOM OFFICE REHAB CLINIC 117 VACANT VACANT VACANT VACANT CLNR To H building. 105 MEETING RM 104 103 0 1 2 3 4 5 Building S Level 1 POST GRAD ROOM REHAB CLINIC OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE M. W.C. To H Building Food Technology area and through to F Building STORE OFFICE OFFICE CHROMO LAB 209 STORE OFFICE VACANT LAB OFFICE STORE OFFICE OFFICE 0 1 2 3 4 5 N OFFICE UTILITY STAFF HOT DESK TRAIN'G BTH RM EQUIPM'T STORE STUDENT AREA COMPACTUS CONTROL RM SIM MAN DEBRIEF / TUTORIAL EXTENSION TUTORIAL ROOM YEAR 3 LAB YEAR 1 LAB YEAR 2 LAB BREAKOUT SPACE S207 S202 S206 S214 S210 S203 S205 S208 S204 S201 S213 S212 S211 S209 EX SERVICES RISER CORRIDOR SC01 14 59.6 54.4 68.2 39.3 57.2 10.5 10.5 14.0 33.8 10.3 13.1 13.1 15.1 10.4 19.4 6.3 13.3 13.7 10.9 10.4 260.5 16.4 21.8 38.3 60.2 66.6 68.0 33.8 11.4 VACANT VACANT VACANT F. W.C. DIS. W.C. Building S Level 2 CLNR up up up up 8.16 11.71 11.48 13.67 10.97 17.36 31.19 25.98 9.23 62.76 10.76 10.75 11.98 2.82 10.82 10.76 10.76 10.02 11.14 7.07 7.07 12.02 11.86 5.20 8.11 15.02 11.95 11.26 31.02 156.67 22.75 24.15 void over PASSAGE STORE U BUY STORE LECTURE THEATRE 101 STORE PREPARATION ROOM 101B ENTRY THEATRE LOBBY MALE FEMALE MECHANICAL PLANT ROOM STAFF ROOM OFFICE OFFICE OFFICE OFFICE OFFICE STORE STORE STORE OFFICE OFFICE OFFICE DIS. WC OFFICE RECEPTION 002 003 004 005 006 007 008 009 010 011 012 013 014 015 016 001 A 002 A 003 A 004 A 005 A 006 A 007 A 008 A 009 A 010 A 011 A 012 A 013 A COOLING TOWER PABX RECEPTION 001 SWTCH RM 0 1 2 3 4 5 Building T 017 N Level 0 OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE F. W.C.. STORE 104a STORE 107 STORE 108 VICE-CHANCELLOR OFFICE AREA MEETING KITCHEN STAFF RECEPTION 106 109 110 111 112 113 114 OFFICE 104aa THROUGH TO D BUILDING - OVC AREA 103a KITCHEN 102a 100a 108a 105a 106a 107a 109 a OFFICE HEAD OFFICE FILES 108 a N Building T Level 1 North STAIRS OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE THROUGH T BUILDING SOUTH 9.72 8.98 41.25 15.19 9.84 10.80 13.82 17.62 10.81 9.84 10.80 10.81 31.83 75.85 18.26 7.40 2.94 20.31 10.15 11.13 13.86 17.63 10.80 9.84 10.81 10.80 9.84 36.55 11.49 10.49 10.75 PLANT ROOM OFFICE 309 OFFICE 308 OFFICE 310 OFFICE 311 OFFICE 312 OFFICE 313 OFFICE 314 315 OFFICE 307a 303 OFFICE OFFICE 302 305 OFFICE OFFICE 306 OFFICE 304 319 OFFICE 319a CLASSROOM 322 323 OFFICE OFFICE 321 320 OFFICE OFFICE OFFICE 318 OFFICE 307 OFFICE 301c CLASSROOM 317 STORE 317a STORE 317b 18.77 9.30 OFFICE 301 OFFICE 301b 0 1 2 3 4 5m Building T Level 3 OFFICE OFFICE 301a OFFICE OFFICE 316a 316b MALE W.C. FEMALE W.C. CLEANER N 157.42 21.59 10.36 10.36 10.36 8.81 44.38 25.77 14.25 19.08 11.77 8.54 38.82 2.05 3.53 16.62 12.70 11.99 13.53 SHAFT LIFT CLNRS OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE wc QUIET SPACE OFFICE OFFICE OFFICE OFFICE WALKWAY DOWN SHAFT roof 201 202 203 204 205 206 207 208 209 210 211 212 213 214c 215 216 CLIPP PASS PROGRAM N PLANT ROOM PLANT RM OFFICE 213a 214b OFFICE 214 214a 200 OPEN SPACE 212a Building U Level 2 11.26 144.10 95.97 72.40 22.53 96.41 17.54 47.29 22.34 22.34 31.96 24.02 29.99 82.90 84.65 82.20 33.63 8.09 7.60 18.98 13.45 19.96 4.12 6.57 6.57 4.60 7.90 VOID OVER CORRIDOR STAIR 4 AIRLOCK N Y Building Level 0 East Wing 0 1 2 3 4 5 C/R TRAINNING SHARED TEACHING 017 ELECTRICAL ENGINEERING FUNDAMENTALS LECTURE THEATRE 022 024 026 028 030 031 029 027 027A 025 023 020 019 019A 018 ELEC.ENG.TECH OFF./PREP.PRAC MECHANICAL ENGINEERING FLUIDS LAB HYDROMETALLURGY LAB METALLURGY ROUGH PREP METALLURGY FURNACE CIVIL ENGINEERING CONCRETE TECH APPLIED MECHANICS STRUCTURES MECHANICAL ENGINEERING LAB MECHANICAL ENGINEERING WORKSHOP MECH.ENG STR ENGINRG TECH. OFF. CIVIL ENG MAT. TESTING LAB CIVIL ENG INSTRON LAB ENG SPECIAL PROJECTS RM CONTROL SMOKE TUNNEL DIS. WC F.WC M.WC CLNR LOBBY VOID OVER AIRLOCK CORRIDOR 021 023B 023A 016 STORE 017A SERVICES 166.22 4.42 19.07 RISER 305 N 0 1 2 3 4 5 Y Building Level 3 East Wing PLANT ROOM N 13.67 160.99 40.23 304 43.20 156.19 303 30 305 301 0 1 2 3 4 5 Y Building Level 3 West Wing 8.58 17.62 17.39 43.59 37.27 75.58 46.95 130.70 25mm SETDOWN TO GABION WALL AREA ENTRY 0000 PH DOS'G ROOM GABION WALL GABION WALL Y Building 0 1 2 3 4 5 Level 9 GAS METER SHELL FIELD STORES WASH FLAMMABLE GAS STORE FLAM DG STORE MIXED DG STORE CORRIDOR CORRIDOR 902 GAS STORE LIQUID NITROGN STORE ELECTRICAL SUBSTATION ELECTRICAL SWITCH ROOM CONS. STORE TROLLEY SPACE AIRLOCK GOODS LIFT MECHANICAL PLANT MINERALS STORE ENG. STORES HYDRAULICS PLANT MECHANICAL PLANT CORRIDOR GABION WALL GABION WALL GABION WALL GABION WALL CRAWL SPACE LIFT WELL THEATRE (SUB FLOOR SPACE) RISER 3 903 901 902A 904A 904B 907 904 909 910 912 913 911 911 908 917 916 915 906 905 COLD ROOM 918 ROLLER DOOR 77.37 136.32 377.04 5.90 17.74 N 53.79 15.76 15.76